Who this plan suits

Before you start: use pain-free ranges of motion and loads you can control. If you have an injury, medical condition, are pregnant or are returning after a long break, get individual guidance from an appropriately qualified professional.

Your weekly plan

Monday

Full Body A

5 movements
Squat or leg press3 × 6–10
Bench press3 × 6–10
Cable row3 × 8–12
Leg curl2 × 10–15
Calf raise3 × 10–20
Wednesday

Full Body B

5 movements
Romanian deadlift3 × 6–10
Overhead press3 × 6–10
Lat pulldown3 × 8–12
Split squat2 × 8–12 / side
Rear-delt raise3 × 12–20
Friday

Full Body C

5 movements
Hack squat or goblet squat3 × 8–12
Incline dumbbell press3 × 8–12
Chest-supported row3 × 8–12
Hip thrust2 × 8–12
Arms or weak point2–3 × 10–20

How to progress

Begin with two or three reps in reserve. Add reps while staying inside the range; add load when all working sets reach the top with the same technique.

How to manage recovery

Keep a day between sessions. If time is tight, perform the first three movements rather than skipping the entire workout—the main patterns carry most of the plan.

Frequently asked questions

Can I build muscle training only 3 days a week?

Yes. Each muscle receives repeated weekly work, and the rest days can support stronger, higher-quality sessions.

Is full body better than push pull legs for 3 days?

For many people, full body distributes muscle frequency more evenly. A once-weekly push/pull/legs rotation can work, but missing one day delays that muscle for another week.

Can I do cardio on rest days?

Yes. Easy or moderate cardio can fit on one to three rest days depending on your goal and recovery.

The plan should learn from the result

Turn this starting point into an adaptive plan.

Adapt Fitness records what you actually complete, highlights undertrained muscles, and adjusts the next workout around your progress, equipment and recovery.

See Adapt Fitness ↗